Belarus: Fuel Loading Starts At Nuclear Power Plant

Eurasia Review

Published

Fuel loading began this week at unit 1 of the Belarusian nuclear power plant, Russian state nuclear corporation Rosatom has announced. At 11:45am local time, the first fuel assembly was loaded into the reactor and a total of 163 assemblies will be loaded before the end of the month.

Following fuel loading, the reactor will be...

Full Article